Cross-border collaboration in action — improving river ecosystems, enhancing water quality monitoring and supporting communities to protect and restore shared catchments for the long term.

Catchment Action for Local Management

Protecting Our Shared Waterways Together

Delivered by East Border Region in partnership with leading environmental & research organisations

Working Across Borders for Cleaner Rivers & Healthier Ecosystems

CALM is a cross-border environmental project tackling one of the most pressing challenges facing our rivers: too much nutrient and sediment washing into the water. Left unchecked, that pollution damages habitats, harms biodiversity and puts water quality at risk across the catchments we share.
Worth over €8.2 million and funded through the PEACEPLUS programme, CALM brings six partners together across Northern Ireland and Ireland to restore river habitats, cut pollution at source and build lasting community involvement in how our catchments are managed. The project was launched in Carlingford in March 2026.

Our Objectives

What We Set Out To Achieve

CALM works towards cleaner water and healthier ecosystems in cross-border catchments by reducing the nutrient and sediment loads that rivers carry. In practice that means:

Improving water quality in targeted catchments

Developing a practical catchment strategy for managing nutrients

Growing community awareness and involvement in protecting local rivers

Building sustainable, repeatable nutrient management practices

Running a robust, transparent water chemistry monitoring campaign

Our partners in improving river health & ecological resilience

How We Do It

The work spans nature recovery, innovation, invasive species control and smarter nutrient management. That includes riparian fencing and planting, constructed wetlands and floodplain reconnection, controlling invasive species such as Himalayan Balsam and Giant Hogweed, and piloting new approaches like turning surplus slurry into biomethane.

Because water crosses borders, so does the project: partners on both sides coordinate their efforts so the whole catchment benefits, not just one stretch of it.

M

Installation

– Under 24 Hours

Fix & Care

– Under 12 Hours

Uninstallation

– Under 48 Hours

Design by Divi Pixel Copyright © 2025. All Rights Reserved.